Berkeley USD School Board Meeting March 18 2026
By Berkeley Unified School District
Summary
Topics Covered
- Berkeley High Tops State UC Admissions
- Tennis Team Endures 25 Years Without Courts
- Classified Staff Drive Equity Programs
- Board Approves Long-Delayed Tennis Courts
Full Transcript
So, we're going to call to order though.
We um so we just called to order at bit after 7 um as part of the district's continued
commitment uh to transparency, equity, and meaningful engagement. We have partnered
meaningful engagement. We have partnered with Worldly, which is a translation system and captioning P platform. Um, it
allows students, families, and members of the community access to real-time translation. Um, this tool is available
translation. Um, this tool is available in both inerson and virtual attendees if you need. So, there should be um posters
you need. So, there should be um posters on the side of the boardroom with a QR code. Um, and also for those online,
code. Um, and also for those online, they can also access uh wordly as well for translation. Um, per our standard
for translation. Um, per our standard um uh policy um, we just want to remind folks of,
um, appropriate behavior in the boardroom uh, decorum expectations um, throughout tonight's meeting. So
that just means that no person shall disturb the order of this meeting. Such
behavior includes, but is not limited, booing hissing creating and participating. in a physical
participating. in a physical disturbance, speaking out of turn in violation of applicable rules, preventing or attempting to prevent others who have the floor from speaking,
preventing others from observing the meeting. Bless you. Um, entering into or
meeting. Bless you. Um, entering into or remaining in the area of the meeting room that is not open to the public or approaching the DAS without permission.
And I know no one's going to do any of this stuff, but it's part of our bylaws with meeting conduct. And also with regard to complaints concerning employees, um please do refrain from
making such complaints during public comment. Um you can email uh complaints
comment. Um you can email uh complaints at berkeley.net. Super convenient.
at berkeley.net. Super convenient.
complaints berkeley.net. All right.
We're going to approve the board agenda.
>> Yeah. So Liz, please do roll call. Thank
you.
>> Of course. Uh, director Anavas is excused this evening and so is director Cadill Brown who was at away at a conference. Um, director Jennifer
conference. Um, director Jennifer Shamoski >> here.
>> Vice President Jennifer Korn >> present.
>> Student Director Armana Arum >> present.
>> President Mike Cheng >> present. Thank you, Miss Jarz. Um, okay.
>> present. Thank you, Miss Jarz. Um, okay.
So now we will approve the agenda for this evening's meeting.
>> I move to approve. I'll second.
>> Great. Do we have the eyes?
>> I >> I >> I >> uh unanimous is student board director.
Did you have a vote as well on the agenda? Do you typically vote on the
agenda? Do you typically vote on the agenda? No, you don't. Okay. Sorry. I
agenda? No, you don't. Okay. Sorry. I
was trying to give you a vote that you you don't have yet. Um All right.
So, that was unanimous. Um and um seeing that there are no requested changes that this has been approved. Uh we have a report out from Vice President Korn from
our close session.
>> Thank you. Um close session was called to order at 5:34 p.m. with directors
Chang Korn and Chinoski in attendance.
There were two items addressed. Um for
both items 3.1 and 3.2, to the board received updates from staff.
>> Thank you so much, Vice President Korn.
Um while our superintendent is um out of town right now receiving a um a an award um and congratulations to her, of course, the superintendent Ford Morell.
Um associate superintendent Hugan Dyke is going to speak on her behalf. Thanks.
>> All right. Good evening, B USD.
Good evening.
>> Good evening.
>> Okay, we got to try that again because there's going to be some call-in response tonight. Good evening, B USD.
response tonight. Good evening, B USD.
>> Good evening.
>> Thank you. All right, this week we are hash Berkeley proud. So when I say we are, you are going to say Berkeley proud. We're going to practice this
proud. We're going to practice this right now. All right, we are
right now. All right, we are >> proud.
>> All right, one more time. We are
>> Berkeley proud.
>> Great. Um, tonight I'm giving uh comments on behalf of Superintendent Ford Morell. Today she is at the
Ford Morell. Today she is at the California Association of African-American Superintendent and Administrators or
CASA annual conference in Anaheim where she is at this very moment being honored with CASA's equity leadership award
which recognizes superintendent who have demonstrated sustained leadership in advancing equitable outcomes for students. And you may not know that
students. And you may not know that African-American women make up less than 2% of superintendent in our entire country. In addition to the award she is
country. In addition to the award she is receiving today, yesterday, Superintendent Ford Morell was recognized for her exemplary leadership and service in education amongst a
cohort of California women's superintendent in honor of Women's History Month. We are
History Month. We are >> All right, we're getting there. Okay,
thi this week we are also Berkeley proud because both Longfellow and Willard middle schools were named as two of the 48 California middle schools and high
schools selected for the prestigious 2026 California Distinguished Schools program. Eligibility for these
program. Eligibility for these identified eligibility for these three identified categories of either high achievers, gap closer closers, or
beacons of opportunity is determined by metrics generated through the California Statewide Accountability System for public schools, the California School Dashboard. The 2026 California
Dashboard. The 2026 California Distinguished Schools were determined using data from the 2025 California School Dashboard. I'm honored to say
School Dashboard. I'm honored to say congratulations and extend appreciation to Longfellow and Willard for their dedication uh their dedication and
commitment to our students. Go Tigers.
Go Phoenix's. We are
>> Berkeley.
>> All right, we're getting there. Um, and
this week we are also hash Berkeley proud because the San Francisco Chronicle released a new analysis looking at how well California public high schools prepare students for
admissions to the University of California system. Instead of simply
California system. Instead of simply ranking schools by raw acceptance rates, the analysis looks at how many UC admissions offers uh offers a school
would be expected to receive based on the demographics of its students and then compares that to the actual results. Using this approach, Berkeley
results. Using this approach, Berkeley High School ranked number two in the state among traditional public high schools for outperforming expectations
for admissions to some of the most se selective UC campuses. Even more
impressive, Berkeley High earned 42 more UC admissions per 100 seniors than the model predicted while serving a
graduating class of nearly 800 seniors.
This is a big, diverse, comprehensive high school and our students are showing what is possible. This recognition
reflects the work happening every day at Berkeley High. From our students and
Berkeley High. From our students and families to our teachers, counselors, and staff who support students in dreaming big and preparing for what
comes next. Go Jackets. We are
comes next. Go Jackets. We are
>> There we go. Um B USD continues to focus on enhancing and improving our and expanding our afterare options for our families. As you may be aware, the
families. As you may be aware, the afterchool team has initiated an engaged expanded learning campaign and they are now currently in phase three of this
work. This campaign aims to deeply
work. This campaign aims to deeply understand and intentionally improve the after-school experience for students, families, and staff by systematically listening to voices at the school,
identifying strengths and challenges, surfacing outliers, and acting on learning through a continuous improvement equity centered lens. Our
team will be sharing information at a board meeting this spring. And this
week, they will present an update at the 2 by two committee meeting. So, please
check the district website for the 2 by 2 meeting information.
Next Friday, our B USD schools will participate in what we are now calling Day of Service and Learning, which was formerly called the Caesar Chavez Day of Service and Learning. In light of the
recent allegations, we felt it was necessary to make this change. It is
important to know that BUSD takes allegations of harm very seriously and those actions do not reflect the values of our community. We also recognize that
movements for justice are always bigger than any one individual. in Berkeley
Unified and in line in in alignment with our board's resolution, we will continue to honor the legacy of the farmworker movement by centering the collective
struggle and many voices including Doloresa, Larry Leong, Philip Veraracruz, immigrant workers, all who led and sustained it, including the
leadership of women who have too often gone unrecognized.
We also continue to value the resolution's focus on student learning, community service, and the rich histories of the Chicanx and Latinx and
Filipino communities in our schools.
That legacy is reflected in the values, activism, and civic traditions of our community and resonates with Berkeley's longstanding commitment to equity and justice.
Tonight, the facilities department will be giving an update on many of BUSD's projects. And I see some folks in the
projects. And I see some folks in the room who are probably here to listen and comment on that. Um, the board will hear hear updates and have an opportunity to
ask questions about the following projects. Longfellow, Sylvia Mendes, B
projects. Longfellow, Sylvia Mendes, B USD's workforce housing, the Berkeley High Theater, the districtwide crisis alert system, and Mulleringfield. The
board will also be asked to take action on a recommendation about Mullering field from the facilities subcommittee.
Also tonight, our business services department will be presenting the second interim report. This is a mandatory
interim report. This is a mandatory fiscal update that provides a snapshot of a school district's health fiscal health as of January 31st. It compares
updated revenue and expenditure figures against the first interim report to certify to the state whether the district can meet its financial obligations for the current year and two
subsequent years. This is critical
subsequent years. This is critical information for us as we look ahead to developing our 202627 school year budget. Please stay so that
you can hear more. And I'll close out by saying we are >> great. Good evening.
>> great. Good evening.
>> Great. Thank you so much, Associa Superintendent Huggenike. Um that was a
Superintendent Huggenike. Um that was a rousing uh presentation. Um we'll now move on to public comments. There's a
lot of public comments. So um we're going to move through really rapidly.
There's a lot of you here and we want to make sure to hear your hearts and minds.
We're giving each person two minutes. Um
I'm sorry, one minute. Um one minute to stay within our 30 minute. Uh thank you, Vice President. um stay within a 30
Vice President. um stay within a 30 minute um time frame and I I will have to cut you off. It's not meant to um you know be uh impolite but at one minute the timer I'll also beep and I'll have
to ask you to to move to the next person just so that everyone can have a chance to speak. Um all right we uh by practice
to speak. Um all right we uh by practice we start with our students first of course. Um, first up we have Marilyn W.
course. Um, first up we have Marilyn W.
And then perhaps sitting on the side to get ready is, and I'm sorry, I'm trying to read the handwriting is Ice Isa BT ice issa, I'm sorry. Okay, issa BT. So,
um, does Marilyn W, you want to come on up first and then Issa, you can be on the ready to come on up. Cool.
Um, hello. My name is Marilyn Whiteside and I am a junior at Berkeley High School and I've played on the Berkeley High School girls tennis team for three years. Being a part of this team has
years. Being a part of this team has meant a lot to me because of the close and supportive community that the coaches and us players have created.
Through the team, I have met and become friends with so many people that I think I wouldn't have had the chance to meet without. So, I am very grateful to our
without. So, I am very grateful to our school's tennis program. However, our
program has been stuck without on-ampus courts for 25 years. Without onampus
tennis courts, we have have been forced to look to and heavily rely on others to support our program by letting us use their courts and equipment. In my three years on the team, we have called three
different locations our home. All of the courts that we have played on have been at least one mile away from Berkeley High School. This means that no matter
High School. This means that no matter if our match is a home match or an away match, we must miss valuable in-class learning time and travel to some off-campus courts. As a result of having
off-campus courts. As a result of having to travel, even to home matches, I have personally struggled academically because of >> want to finish your last sentence
quickly.
>> Okay.
>> I told you it was going to be rough.
just support us, please. We've been
waiting a long time and we'd really appreciate it. Thank you.
appreciate it. Thank you.
>> Okay. Thank you.
>> Thanks a lot.
>> Um Isa, please. And then next on up, Liam Buffington. And the minute does go
Liam Buffington. And the minute does go up uh really quickly.
>> Hi, my name is Isabelle Thompson. I am a junior on the Berkeley tennis team. Um,
and this the team has been a very important part of my high school life so far. Unfortunately, over the over my
far. Unfortunately, over the over my three years on the team, our location has changed three times. Building
permanent courts for our team would allow our community to thrive in a more set and stable environment. The program
would thrive um altogether and the students of and the community would benefit. Additionally, closer courts
benefit. Additionally, closer courts would give back time to students. um
they would restore the 30 plus minutes on a daily lost to commuting to our courts. Over my time on the team, I've
courts. Over my time on the team, I've noticed that fewer people show up to our home matches because of the commute and because our courts aren't nearby and not well represented. Home courts would be
well represented. Home courts would be our chance to showcase our sport to the Berkeley community. Thank you.
Berkeley community. Thank you.
>> Thank you so much, Liam. And then right behind Liam, thank you. Right behind Liam would be
thank you. Right behind Liam would be Samantha L.
>> Okay. Um,
>> all right. Can I start? Okay. Hi, I'm
Liam Buffington. I'm a senior on the Berkeley High boys tennis team. This is
only my second year on the team, but I can already identify the strong roots that the tennis team has in Berkeley High's culture. and the team has
High's culture. and the team has continued to persist and remain strong despite the removal of our home tennis courts. With that being said, I still
courts. With that being said, I still believe building home courts at Mullering Fields is a worthwhile investment. This investment goes beyond
investment. This investment goes beyond convenience. It restores a vital part of
convenience. It restores a vital part of Berkeley High's identity. Our team has proven its strength without home courts, but I can only imagine what we can achieve with them. Thank you for your consideration.
>> Thank you. Um, we've got Samantha L. And
then next on up, um, Otter Kar Karich Chow. Apologies for misprononunciation.
Chow. Apologies for misprononunciation.
>> Otler. Are you gonna go? Okay. Hi
everyone. My name is Otter. I'm a junior at Berkeley High and I've been on the varsity tennis team since my freshman year. That might sound like an
year. That might sound like an impressive story to anyone who doesn't know that Berkeley High actually only has a varsity team. There are players who make varsity only to be perpetually benched. players who would be good
benched. players who would be good enough for a JV team, but are instead cut from high school tennis altogether, and most importantly, players who don't even want to try out once they hear that they'd be playing at rented public
courts, constantly having to chase or be chased off by other non- Berkeley High players, and really playing a sport that hardly feels like it has a connection to the school itself at all. Ever since the demolition of our home courts back in
2001, we've had to constantly seek new facilities. We end up putting more time
facilities. We end up putting more time and energy into logistics than into the team itself. Right now, we're visitors
team itself. Right now, we're visitors wherever we play. Our home matches frequently have a larger audience turnout from the opposing school community than from our own. With courts
to call ours, we would not only be fostering a more inclusive and inviting program for students, but creating a real home and a beacon for tennis in Berkeley. So, I know I'm speaking for
Berkeley. So, I know I'm speaking for everyone in this room repping a Berkeley High tennis hoodie when I encourage you to support this plan and its tennis courts so that Berkeley High students can finally have a home for our program.
Great. Thank you.
So, oh, you Samantha here. You want to come up, Samantha? Thank you.
up, Samantha? Thank you.
>> Wrap around. Okay.
>> Um, hello. My name is Samantha. Um, I'm
a captain of your 2025 2026 women's tennis team. I've been playing this
tennis team. I've been playing this sport for 12 years and been on the team for 12. As a freshman, I was thrilled to
for 12. As a freshman, I was thrilled to partake in the sport and thrilled for the the courts promised for my senior year. Um, it's now been 25 years since
year. Um, it's now been 25 years since we've had courts, and I never got to realize those courts as a senior. I've
worked with our lovely coaches, Tiffany and Nick, to keep um, motivating this team through the season, but it was really rough. And if I'm being honest,
really rough. And if I'm being honest, um, instability in one area of the team really brings instability to every other area. So, I'm hoping that you guys will
area. So, I'm hoping that you guys will consider approving the five tennis courts at Mullering. though our
freshman sophomores juniors my teammates, all of those who I had the joy of welcoming to the team year over year would have home courts to play on
very very soon. So I ask that you ask or I ask that you allow these courts to be realized for them, for my freshman self that didn't see the success of these courts and the 25 classes that have come
before me. Thank you.
before me. Thank you.
>> Great. Thank you so much. Um,
good job. Thank you. Okay, next on up we have Will Parker and then Felonius Holmes right behind Will. Will Parker
come up please and then Felonius Holmes and then Arouch Madan.
Cool.
>> Uh hello. Good evening members of the board. My name is Will and I'm a senior
board. My name is Will and I'm a senior on the Berkeley High baseball team. I've
spent the last four years representing this school on the field and I'm here to tonight to advocate for for a solution that ensures the future of our athletic programs, the restoration of our tennis
courts and the turfing of our baseball field.
>> I'm asking the board to look beyond a temporary fix and invest in a long-term solution.
By restoring the courts and turfing the field, you are giving Berkeley High athletes the facilities they deserve.
Let's make sure the next generation of jackets spend spend their time winning games and not waiting for the mud to dry. Thank you.
dry. Thank you.
>> Thanks so much. Um Felonius and then Arouch next.
>> Good evening. My name is Felonius and I'm speaking in support of building tennis courts at Tim Mullering with lights included right now.
Right now, our team practices by reserving public courts near Cal. That
works, but it means depending on outside court availability and taking up courts that other people in Berkeley also want to use. Courts at Tim Oering would give
to use. Courts at Tim Oering would give a real home and reduce pressure on other public courts. It would make practices
public courts. It would make practices and matches more consistent while also giving students the kind of dedicated space that other sports already have.
Lights matter because our season includes months when it gets dark early and they would make the courts usable for both the players and the community.
Thank you.
>> Thanks so much. Um Arouche and then next up after Arouch if we could have Gloria Bell.
>> Hi, my name is Arouche Madon and I'm a freshman on the boys team at Berkeley High. Even in my first year, the
High. Even in my first year, the challenges are already clear. Practices
and matches often require commutes of over 30 minutes, which is even harder for students without reliable transportation. At Channing, the
transportation. At Channing, the bathrooms are almost always locked, forcing players to have to go leave practice just to find one. Often having
to go to nearby shops and spend money.
We also frequently lose court space to cow players when we don't have them reserved, making practices less effective and not letting us use our time in a way that's going to help us build our skills. Without home courts,
managing equipment and scheduling also becomes much harder. These issues take time and energy away also from what really matters. Building teamwork in
really matters. Building teamwork in improving our skills on in this lifelong sport and enjoying it. Access is another major issue. Nearly 70% of students who
major issue. Nearly 70% of students who tried out didn't make the team this year and many were cut from high school tennis entirely. Often the difference
tennis entirely. Often the difference comes down to access to private lessons, something not everyone can afford.
Building tennis courts would fulfill a 25-y year promise to Berkeley High and support B USD's core values of equity, engagement, and enrichment.
>> Cool. Thank you so much.
>> All right, good job everyone keeping within a minute. And um so we have Gloria Bell up and then after Gloria Zea pronouncing your name properly. So
thanks uh tennis folks really appreciate but um Gloria is up and then Zeba.
>> I see my time to Hannah Slaughter Wise.
Okay, Hannah. Um.
Hannah. Um.
Oh, we don't see time. Do we see time?
Okay.
Okay.
>> Hello. Hello, my name is Hannah Slatterie Weisberg and I'm the chair of the Berkeley Youth Commission and I'm speaking here today on behalf of the commission as well as our constituents, the students of BUD. Myself and my
sergeant-at-arms are here to urge the district to address significant gaps and concerns identified by the students regarding the teaching of the Israeli Palestinian conflict in Berkeley schools. Each student each schoolboard
schools. Each student each schoolboard member should have received a copy of the full length letter including the results in their email. From December
8th to January 12th, the youth commission conducted a survey that received 63 responses from students across Berkeley Unified School District.
Respondents V represented a wide range of grade levels with the largest groups consisting of 11th grade students and eighth grade students, demonstrating that these concerns span both middle school and high school populations. When
asked how much they have learned about the Israeli Palestinian conflict in school, 70% of students reported low exposure, selecting a one or two on a five-point scale. In contrast, students
five-point scale. In contrast, students reported learning significantly more about the conflict through social media with over 61% selecting a four or five on the same scale.
>> Is it do I have my additional time as well?
>> Okay, thank you.
>> Yeah, I'm sorry. Thank you for the Thank you. And you can also email us again too
you. And you can also email us again too if you want to follow up. Um so you cannot um seed in the sense of adding on to someone else's. Um so does that mean
that Gloria, do you want to still speak >> recognizing? No, thank you. Okay, cool.
>> recognizing? No, thank you. Okay, cool.
So, next on up we have Zea. And then
after Zea >> Za had to leave.
>> Oh, Za had to leave. Okay.
Okay. So, um Ida Marshall Cap.
Ida Marshall Cape is next. Is Ida here?
>> Oh, cool. Hey, Ida. And then next is apologies for misprononunciations. Amila
Amila Amigo would be next.
>> Hi, my name is Ida Marshall Lee and I'm the sergeant-at-arms of the Berkeley Youth Commission. Continuing with the
Youth Commission. Continuing with the words of Hannah, our chair, I would like to elaborate on our recommendations for the implementation of said education into Berkeley schools. Student responses
clearly show that how this topic is taught matters deeply. Concerns raised
by students who were hesitant or opposed to learning more in school included fears of bias, unproductive or hostile classroom environments, or emotional distress. Some students expressed
distress. Some students expressed concern about anti-semitism, while others emphasized the need for Palestinian voices to be included without being dismissed or mislabeled as anti-semitic.
Um, overall the main themes that we saw included in in in the student responses included clear distinctions between governments, armed groups, and civilians, assurance that Palestinian, Jewish, Muslim, Israeli, Arab, and other
students would not be targeted or blamed, structured discussions grounded in historical facts before debate, a safe, judgment-free environment with clear guidelines for dialogue. Um,
overall, we we sent you the email, but thank you for your time and consideration. Very sincerely, the
consideration. Very sincerely, the Berkeley Youth Commission. Thank you.
Great. Thank you.
Um Amila Amila. Oh, you're not gonna speak. Okay. Okay. Cool. Thank you so
speak. Okay. Okay. Cool. Thank you so much. Um next on up we have or you can
much. Um next on up we have or you can clap if you want. Um uh Phyllis Oyama and Ross Parker. Phyis Yama if you come
up first and Ross you be on deck.
>> Phyis, are you here?
Are you doing some trading?
>> Ross, you coming up? Okay, cool. Ross,
>> so Phyis may not be here. Okay, thank
you.
>> Okay, fine.
>> Good evening, board. Thanks for having us uh and allowing opportunity to speak.
My name is Ross Parker. I'm a teacher at Berkeley High School. Um, just really quickly, I coached the tennis team for four years in 2011 to 14. I've coached
the baseball team. Uh, and so I've lived the life of marching a mile and a half away to play games, as well as getting buckets and hoses and everything else to get off the baseball field for hours and hours and hours when it rains like a
tenth of an inch. Um, I think this is a really great opportunity, this plan to write a historic wrong of 25 years that is just hard to even wrap my mind around. Uh, as well as fix what looks
around. Uh, as well as fix what looks like a beautiful field but wasn't done correctly 13 years ago. and in one fell swoop, you can make a lot of kids' lives a lot easier and make the school a lot prouder. So, I hope the board acts on
prouder. So, I hope the board acts on that. Thank you.
that. Thank you.
Thanks a lot, Ross. Um, next on up we have John Slatterie and then after that, Jeff J.
if they could uh be on the deck.
John, are you here?
Mr. Slatterie.
Okay. So, Jeff, you going to come up first?
Who's coming up? John or or Jeff?
>> Okay.
>> Good evening, school board.
My name is Jeff J. I'm the head boys tennis coach at Berkeley High for the last 12 years. First, I want to thank
the board facility subcommittee for their support. Last night, they voted
their support. Last night, they voted yes to move forward with a full board vote on the proposal to fund construction of five tennis courts with
lights at Mouldering Field, hopefully completed by spring of 2027.
Tonight, we have an opportunity to make history by investigating in tennis courts that will benefit both
our students and the broader community for years to come. Please, let's make it happen. Go Jackets. Berkeley proud.
happen. Go Jackets. Berkeley proud.
Thank you. Um, on the next one up we have Dar Perau and Michael Karich Chow.
Is there a Dar Derek Perau and Michael Karich Chowo beyond deck? Thank you.
deck? Thank you.
>> Thank you. Uh, hello. My name is Darra Perau and thank you for allowing me to share some thoughts with you tonight.
I'm a parent of a BHS high school student has played on the girls tennis team for the last four years. I came
here today because not having tennis courts for Berkeley High School is and has been a persistent blemish on the Berkeley High School's character and commitment to excellence in sports. It
has negatively impacted the quality of life for many tennis coaches, parents, and hundreds of students who have been on these teams over the years. When
Measure G passed in 2020, I was positive that my daughter would be playing on new test courts before she graduated high school. And here we are six years later
school. And here we are six years later still rehashing the same problem and trying to come up with another solution.
It has been really disheartening to see one by one proposals getting knocked down to build these tennis courts. And
in addition, many courts in Berkeley have been torn down and replaced with housing or parking structures and more are planned.
Thank you so much. Thank you. You want
you can email stuff to us as well. Um
Michael Caricho and then Peter Peter Wright if you could be on deck. Peter
Wright after Michael. Thanks.
>> Uh hello school board. Um my name is Michael Kerry Chow and I'm the parent of a Berkeley High student athlete.
We uh anytime we build a project in Berkeley um there are neighbors that are affected with every project and we need
a board that doesn't cower to every neighborhood group that stands up for the students and uses every square inch
of the limited Berkeley land for our students and their benefit.
We need this board. We support this board and I believe tonight this board is before us. Thank you very much.
>> Thank you so much. Um is Peter Peter right here >> and then Thank you. And then after Peter be Dan Brazen.
Yeah, Dan the man. Thanks.
Hello school board. Uh I just uh my name is Peter Wright. I played tennis here a long long time ago and for the last 25 years uh I've been supportive of coach
JW and the efforts to bring the courts back to Berkeley High School. I'm super
encouraged by your actions of late uh yesterday and today and Mullering Field which is uh for those of us who've been in Berkeley for a long long time it's an
area that can be improved upon. And I
think it was built with the best of intentions and now we can really make it great for baseball and for tennis. And I
think this is writing uh the ship for these young people who are so super impressive uh and our community which is backing this. Uh I'm I'm excited about
backing this. Uh I'm I'm excited about this. I I couldn't be more happy for our
this. I I couldn't be more happy for our coaches, our team members, and future generations of Berkeley High students.
So, thank you so much and go Jackets.
Thank you.
Thanks a lot everyone for um moving quickly and Dan is on up.
>> Yeah. So, uh I just got my uh March 15th notice. Um, I know this is not a you are
notice. Um, I know this is not a you are definitely getting laid off notice, but I hope that all of these get rescended
because, you know, we we shouldn't be we shouldn't be uh laying people off every year, especially cuz I was really
dismayed to see that among the 107, I think, uh, you know, possible layoffs was eight people in the office in family
engagement and equity. which um I think would be very pennywise and pound foolish because those people solve lots of problems
before they escalate to becoming much bigger problems that could result in extremely expensive lawsuits for the district. So please don't balance the
district. So please don't balance the budget on the backs of employees who do really hard work for you. And as always, free Palestine.
Um, thank you. So, next on up we have um committee comments.
Do we have members?
>> Any online? Nope. Okay. So, not online, not in person. So, we're moving on to union comments. I thought I saw some
union comments. I thought I saw some union folks here. Would you like to make comment?
BCC.
Thanks.
I like my guide.
Good evening, school boards, associate superintendent, assistant superintendent.
Um, before I say anything else tonight, I want to take a moment to do something we don't do enough of in this space. I
want to acknowledge the people who did the work.
My name is Mild Sher. I'm the vice president of BCCE.
Tonight, I stand before you in a different space than the last time I prepared to speak because this time BCC has reached a tentative agreement with
the district. And that matters. It
the district. And that matters. It
represents long hours, hard conversations disagreements and moments where we did not always agree, but we stayed at the table. At the end of the day, we are here for what's in
the best interest of our members, students, and families. Too often, we say we reached a tenative agreement and then we move on without pausing, without acknowledging,
without naming the people who made it happen because this work is hard work.
So, tonight I'm going to do what we don't do enough of. I'm going to acknowledge the people because too often we forget something simple but
important. we forget to say thank you
important. we forget to say thank you to the BCCE negotiations team. Each and
every one of you, thank you for the work, the sacrifice, and the commitment it took to get us here. To our district partners for staying in the work even
when it was difficult. To our BCC president for your leadership, your steadiness, and for holding the line for our members.
and to our CTF representative, Miss Erica Williams, for your guidance, your patience, and for never letting us lose sight of who we are in the middle of the work.
So, what people don't see is the disagreement, the difficult conversations, the moments where it have been easier to walk away. But what
matters is this.
We stayed, we worked through it, and we came to agreement together. And that
deserves to be said out loud.
Now, with that said, even though we have settled, our work is not done. While we
can take a moment to say thank you and recognize the work that brought us here, we also have to be honest what comes next. More hard conversations, more
next. More hard conversations, more difficult conversations, especially as we we move on to layoffs and a responsibility to make sure that those
decisions are made the right way. Before
we talk about decisions, before we talk about budgets, before we talk about layoffs, we need to understand something that is being missed. Classified staff
are not just the backbone of this district. They are not just support.
district. They are not just support.
Classified staff are the program and they are working directly with our students every single day. This past
Saturday, the president and I went to observe super science Saturday and what we saw was powerful. That program is run by classified staff, instructional
assistants, instructional technicians, office staff, attendance technicians, BCCE members. We saw our members working
BCCE members. We saw our members working with students, teaching, laughing, building cur curiosity, but what stood out to us the most was the energy in the
room, the excitement. students who were happy to be there on a Saturday learning staff who were fully present, invested, and clearly enjoying the work they were doing. You could feel it. This wasn't
doing. You could feel it. This wasn't
just a program. This was engagement.
This was enrichment, excellence, equity happening in real time. And within that, there was something else that spoke volumes.
The only certificated person there was someone who used to be classified. She
was an admin too who became a credential teacher and still chooses to be there because the program matters because the work matters. So when we talk about
work matters. So when we talk about classified staff we are not talking about just one thing. We are talking about people who working directly with students and the people behind the scenes who make all of this possible. It
takes the people in the classroom and it takes the people ensuring those classrooms can function.
classified positions are reduced and this and that is the disconnect because we cannot be both essential to the work and the first to be reduced. What what
we are seeing is a system that too often prioritizes positions over the work itself. And as a district, we have to
itself. And as a district, we have to ask ourselves, are we focused on titles or are we focused on the work that is actually being done for the students?
Because when we center the work, the answer becomes very clear. The work is happening with BCCE. What we saw on Saturday was not extra. It was
essential. And what and that is what we have to think about moving forward. We
cannot do this work separately. We
cannot do this work if we do not share the same goal for this district. We
cannot do this work if we are not all truly Berkeley proud in action, not just with words. Thank you.
with words. Thank you.
Thank you so much. The time down to the second. Um we've got someone that we
second. Um we've got someone that we missed from committee online um for the African-American advisory success advisory committee, Karina Thomas.
Then we'll we'll come back to any additional union comments if there are any.
>> Hi. Can everyone hear me?
>> Yes.
>> Okay.
>> Good evening. Before I begin, I'd like to ask ask everyone in this room a question. Members of the board,
question. Members of the board, educators, families, community members, for just a moment, I want to invite you to go back in time. Think about when you
moved from elementary school to middle school or when you stepped onto a high school campus for the first time. Think
about that moment, the first day, the new hallways, the older students, the feeling of wondering where you belonged.
What questions did you have that you didn't ask? What do you wish someone had
didn't ask? What do you wish someone had explained to you? What do you wish someone had told you that might have made that transition that transition just a little easier? My name is Karina
Thomas and I am a senior at Berkeley High School and a student representative on the superintendent's African-American Success Advisory Committee. But before I was a senior, before I stepped into
leadership roles, I was a student entering entering Berkeley Unified in Middle School. And I remember that
Middle School. And I remember that transition clearly. It wasn't easy. I
transition clearly. It wasn't easy. I
had to learn a new school community. I
had to find new friends and I had to figure out how to express who I was at that moment in my life while also discovering who I was becoming. Now, as
a senior, I can look back and see just how important those transition those transition moments really were. Moving
into high school was a milestone. It
shaped my confidence. It shaped my opportunities and it helped shape the leader I am today. That experience is one of the reasons I volunteer on the superintendent's African-American
success advisory committee and why I help support the transition fairs.
Transitions can be challenging for any student. But they can be especially
student. But they can be especially complicated for students who may feel like they are one of only a few in their classes, their programs, or their activities.
Sometimes students need support not just academically, but socially and emotionally. and they need to know how
emotionally. and they need to know how to navigate the opportunities that exist within their school system. That is
exactly why I'm I'm excited to invite our community to the 4th annual African-American Success Framework transition transition fairs. On
Saturday, April 11th, we will host the 8th to 9th grade transition fair at Berkeley High School in the Donaghue Gym from 10:00 a.m. to 12:30 p.m. And on
Saturday, April 18th, we will host the fifth to 6th grade transition fair at Martin Luther King Jr. Middle School from 10 to 11:30 a.m. These fairs are
designed to help students and families see around the corner. Students will
have the chance to learn about classes, graduation requirements, clubs, sports, and leadership opportunities.
Families will be able to connect directly with counselors, teachers, and support staff who are there to help students succeed. Our goal is simple. We
students succeed. Our goal is simple. We
want students to begin their next chapter informed, confident, and supported. But these fairs are about
supported. But these fairs are about more than just information. They are
part of the larger work of the African-American success framework. When
the district conducted the needs assessment that helped shape this framework, families shared something important. Many said that navigating the
important. Many said that navigating the school system sometimes feels like trying to understand a black box.
Sometimes the pathways, opportunities, and processes are not always clear. The
transition fairs are one way we are working together to open that box. They
create a space where schools, families, and community organizations come together with a shared goal, supporting our students as they step into the next stage of their education. And as someone
who's walked through those transitions myself, I want to encourage families and students to attend, ask questions, explore opportunities, take advantage of the support that exists in this
community. Let's make sure every student
community. Let's make sure every student in Berkeley knows that the next step in their journey is not a mystery. It's an
opportunity. The superintendent's
African-American Success Advisory Committee remains proud to partner with the district and the Berkeley community as we continue working together to support black and African-American
students and families. And I want to thank everyone in this room and beyond for taking a moment to reflect on our journey. Because when we remember what
journey. Because when we remember what those transitions felt like for us, it helps it helps us better support the students who are walking through those
moments right now. Thank you.
>> Thank you, Karina.
Um I don't think we have not seeing anyone anyone else online. We're going
to um go back to union comments and I don't think we have any more union comments. Um do we have any recordings?
comments. Um do we have any recordings?
No. Uh thank you so much. So board
member comments. Um, I'll start off and then I I'm going to pass it on to the student. I'm going be really fast. I
student. I'm going be really fast. I
know there's lots of folks here waiting for an important um section of our agenda. Uh, thanks so much for coming
agenda. Uh, thanks so much for coming today. It's always great to see your
today. It's always great to see your hearts and minds, see you speaking your hearts and minds. That's the purpose of a forum of this sort. And again, you know, uh, we're we're very excited to
hear uh, the outcome today um, as you are. Um and uh uh policy has been moving
are. Um and uh uh policy has been moving through um uh on uh some important um uh policies and procedures that are coming
before the board. Um I sat in an audit uh that's uh exciting. It could sound boring. It's numbers etc. But um it's
boring. It's numbers etc. But um it's important in this season of the budgetary issues and you heard a lot about some of the potential budget cuts.
Um we're this uh team here, the board here is working very closely um to look at this in a um in a processbased and
principalbased uh approach to um shoring up our um budget and ensuring that we set ourselves up on a good foundation for the future. And I'm just going to pass that on to our uh student uh board
director. Thank you.
director. Thank you.
>> Good evening everyone. So I wanted to mention a quick little anecdote about being on the track team. And there's
this running joke that we have where there's this big annoyance of showing up to practice and seeing a basketball, lacrosse, or football team maybe taking 5, 6 minutes to do a mile workout on the
track. And everybody has something to
track. And everybody has something to say and complain about. And so I really just want to give my deepest sympathies to the tennis team because I can't imagine what it's like to have to deal
with that every single day and not have courts to call home.
I think having home meets and practices builds so much community and so I really am sorry that you guys were not able to experience that with your time at Berkeley High. In regards to the meeting
Berkeley High. In regards to the meeting tonight, I want to keep my comments very brief because I'm very excited to see an equitable lens being applied in the review of Bup and Vera data. I'm
especially interested in the program metrics for uh zero and seventh period courses, especially in relation to summer 2025 credit recovery opportunities, especially for our focus
groups being minorities. I really hope that we continue to prioritize positions and investments that directly support our students. And thank you all for
our students. And thank you all for coming out tonight.
>> Thank you so much, >> Vice President Corn.
>> I will also keep my comments very brief.
Um, I want to thank particularly thank all of the students who came out tonight to speak. It's always just so gratifying
to speak. It's always just so gratifying and important and wonderful to hear student voices in the room. And tonight
we heard from the tennis team. We heard
from the city of Berkeley youth commission and we heard it from a student member of the African-American success advisory committee. And I think that collectively that's um oh and a and
a baseball player. Um, I think collectively, um, it just shows the the power and the strength of student voices in Berkeley. And I thank you all for
in Berkeley. And I thank you all for coming out tonight. Um, yeah, give yourselves a round of applause.
Um, associate associate superintendent Hoganike stole my thunder, but I am also super Berkeley proud of all the things she mentioned. um particularly the
she mentioned. um particularly the distinguished schools awards for King and Longfellow and this amazing report that came out from the San Francisco Chronicle showing that Berkeley High is
number two in the state in beating expectations around sending kids to really um competitive UC's. This is huge and I think we should all be really
proud and I am really proud of every student, every family, every teacher, every counselor, every staff person, every everyone in the Berkeley community
who has worked really hard to create th those opportunities for our kids. So
Berkeley proud Jill.
Um and I think I'll leave it at that. I'm
really looking forward to tonight's conversation about facilities and about budget.
Thank you.
>> I'll also be fast so that we can get to our uh facilities update um which will be in just a couple of items. Um but I do want to just give a shout out to our
CTE programs, especially our um pipeline programs that were honored at the chancellor's breakfast, UC Chancellor's Breakfast last Friday. Um, I also had
the chance to go and tour a bunch of our Berkeley High CTE facilities and programs with the Berkeley Public Schools Fund. And I want to encourage
Schools Fund. And I want to encourage anyone um in the audience or listening to join the May 8th spring luncheon for our Berkeley Public Schools Fund um to
help continue to support that work. And
a big shout out to Windskills and um all the heavy lifting he's done on that program. Uh so we that's it. That's all
program. Uh so we that's it. That's all
I'm going to say for now. Um, and I'm really looking forward to the discussion about facilities.
>> Excellent. Thank you. Um, now we're moving on to consent calendar. Um, is
there a motion?
>> I'll move to approve the consent calendar.
>> There's only three of us.
>> I'm going to second it, but I messed up and I said I messed up the names of the middle schools. It was Longfellow and
middle schools. It was Longfellow and Willard that are the distinguished schools. Oops.
schools. Oops.
>> Um, I will second the consent calendar.
>> All right. Thank you so much. And then
do we have the the eyes?
>> I >> I unanimous. Um and the dog says I also.
So uh the consent calendar is approved.
So okay, let's go on over to our agenda here. Um so uh we're
here. Um so uh we're starting up with 12.18.
Is that correct? Yeah. Um, I'm sorry.
Don't point as part of the 13.1 approval of measure G, which we're all so excitedly waiting for.
>> Update.
>> Approval and re. Yeah, we get the link typo.
Good evening. Good evening, board members. Um, and Miss Chidz, if you can
members. Um, and Miss Chidz, if you can pull up our presentation. Uh, joined
here tonight with me are two of my team members. You guys have met before,
members. You guys have met before, Ashley Del Rio and Kevin Wagner. They're
program managers from Vanpelt. Uh,
Maurice Bordon, our director of facilities, as well as Asia Evans.
Unfortunately, neither were able to be here as originally planned this evening.
So, we're going to pinch hit and do our best for them. Uh, as soon as we have the presentation up, we will start.
Great. Thank you. So, tonight we're here to talk about Measure G and it's a bond update. I know the crowd behind me is
update. I know the crowd behind me is absolutely interested to hear about our mullering field that is later in the presentation with reason and by design because there's several things that have afforded this decision to sort of take
so long for us to bring it to you to make the decision. Uh so next slide please.
Uh our mission we know it. We're always
grounded in those four E as our superintendent has talked about and the facilities division has its own mission which really is designed to fully support the district as well as the community at large. Next slide. So
tonight we're going to talk about we're going to give everyone a update on the Longfellow modernization uh Sylvia Mendes modernization BHS little theater increment one progress update which I'm
just going to say now we need to rename.
It's so disingenuous. The project was originally titled as the little theater because that's what it was intended to be. The state said, "No, you're going to
be. The state said, "No, you're going to do so much more." So, it's actually a much larger project as you'll see tonight. Uh, I'm going to give you a
tonight. Uh, I'm going to give you a brief update on workforce housing, which is really exciting and we're moving quickly. Districtwide crisis alert
quickly. Districtwide crisis alert system, which was something that the board asked us to prioritize and we've done. Uh, program funding update, and
done. Uh, program funding update, and then we will talk about the facility subcommittee update, which includes Muller Ringfield. Next slide, please.
Muller Ringfield. Next slide, please.
And one more. Thank you. Click one more time for me if you would list. Thank
you. So, Longfellow DSA procurement and update. Um, this has been a long time
update. Um, this has been a long time building as you all remember, right? We
brought a Longfellow contract to you all several years ago, started construction and then stopped. Uh, we found major problems with the building that we had to go back to DSA and move everybody
out. The buildings were redtagged. So
out. The buildings were redtagged. So
with that, I'm happy to say that that one project that is now has four formal DSA numbers, it's four separate projects, finally has all of the DSA approvals that it needed. We had those
back in December. So at that point in January 14th, we were scheduling to really go out to bid due to the complexity that we found on this project
where we had to separate one project into four projects to satisfy the state.
But then because work had already begun really do bid leveling to make sure that we weren't paying for the same thing twice. There was over 221 bidder
twice. There was over 221 bidder questions that we had to pull it back and Vanpelt folks and our contractor uh partners at Alton Construction did an
amazing job of several weeks going through four sets of plans over a thousand pages every single item in detail to clarify these. At this point in time, we have the updated schedule
and we will have a price early next week to bring to the board to the next board meeting. So that project, what it
meeting. So that project, what it includes, jump back. Uh structure no structural improvements.
>> Sorry, >> that's okay. Structural improvements and upgrades. Uh we have completed what's
upgrades. Uh we have completed what's needed or we're working on the structure itself between the administration and the classroom wing. If you've ever been to Old Longfellow, I talk about it all the time. The gates there, it had a very
the time. The gates there, it had a very prison-esque feel. We've changed that.
prison-esque feel. We've changed that.
We've made it a very inviting space while actually enhancing the security of it. Um the building envelope
it. Um the building envelope improvements dealing with the waterproofing issues that we had. And
that was not only on the three-story building, the main ad, it was also on the admin building, the library building, and the gym. All of which had structural deficiencies. Below grade
structural deficiencies. Below grade waterproofing, and then campus and site improvements overall. Next slide.
improvements overall. Next slide.
So here's where we are on the timeline.
So what we had originally said even several years ago was that we were targeting August of 27 at this point.
Now understanding all of the structural work that has to be done. The project is pushed. It's pushed by 12 months.
pushed. It's pushed by 12 months.
Honestly, for the level of work that has to happen, 12 months is not bad. It was
actually nice to see. And we've really dug in that schedule to understand and make sure that we're not overpromising.
We're currently in March of 26. We'll
get the new guaranteed maximum price, our contract. From now until September
our contract. From now until September of 27, it'll just be extensive structural upgrades happening. That
three-story building is essentially being taken apart and put back together with all new parts. Uh September to April of 28, we'll be doing modernization improvements, which is a lot of interior work, followed by
continued work, site work, and then final work. So, we anticipate
final work. So, we anticipate substantial completion in June or July of 28 with movein happening that our Longfellow students will be seated back
at home in August of 28 and with that our adult school will be seated back in their home and things will be back somewhat to normal. Next slide.
Uh, Longfellow modernization program impact. This is an important one and we
impact. This is an important one and we talked about this briefly last night at subcommittee. The Longfellow project in
subcommittee. The Longfellow project in the original bond, the original bond plan was slated as an infrastructure project only about $6 million. There was
some concerns around that from the board which there was a little bit of a transition from the board that sat in on helped to create the original bond plan to that board. There was an ask for
about a $10 million project. Due to
scope creep through public engagement and whatnot, it quickly transformed into a $30 million project. Thankfully, it
was early enough in the bond that we were able to go back really look at the overall plan for the entire bond and say we can swing 30 million. Currently, this
project is trending closer to 90 93 million. So, it's very important for the
million. So, it's very important for the board and for the public to understand that Longfellow now represents one of the largest capital improvements of the entire bond program.
um anticipating your questions. If
there's a question that's going to be asked of why not tear it down and rebuild, believe it or not, it would have cost a lot more. Um the expanded project scope, it required the district
to rep prioritize all of the projects in Measure G. Uh last year towards the end
Measure G. Uh last year towards the end of the year, we sat down, we did a workshop with the subcommittee on a Sunday, about the better part of a day, and we rep prioritized and then brought that back to the board where we had to
defer projects. certain projects on were
defer projects. certain projects on were paused or deferred and then program cash flow projections indicate that the major construction of this work and our
expenses will occur between FY 26 and 28. Next slide.
28. Next slide.
Sylvia Mendes. Let me just take it.
So upcoming work for Sylvia Mendes includes the framing, drywall, building utilities, interior, exterior finishes, site improvements.
Summer work is going to focus on interior finishes, casework, installation, final site work, and we should have substantial completion in July. If you have not driven by Sylvia
July. If you have not driven by Sylvia Mendes anytime recently, you'll see there's a large addition, an entire new building that's been added on. Um, and
the team is working hard to get it done.
We wanted to talk about Mendes tonight a little bit. One to update you on the
little bit. One to update you on the schedule, which you see here. Um this is just a nice little infographic which shows the different areas of activity that are happening between now and
moving up to late July. But we also wanted to talk a little bit about the financial impact. So what we have had is
financial impact. So what we have had is there's been number numerous requests that have come from the board as well as really from what we're looking at as
stakeholder initiated adjustments. And
what that means is where our stakeholders, both internal and external, have made demands for things that are a little bit out of the ordinary and that we've never done on other projects. Understanding that, I
other projects. Understanding that, I needed to put this into perspective for our board. The original contract for
our board. The original contract for construction on this project was $49.5 million. Due to a major flaw in the
million. Due to a major flaw in the geotechnical study that was done, as well as some other small minor issues, we had about a million dollars in unforeseen conditions. The reality is is
unforeseen conditions. The reality is is a million in unforeseen for a $50 million qu project is actually quite low. But on top of that million, we've
low. But on top of that million, we've had $3.5 million of cost for stakeholder initiated adjustments. So what I want to
initiated adjustments. So what I want to say to the board tonight and really look for feedback, but at this point in time, any more stakeholder input for added
scope, for added costs, although they seem small and they seem inconsequential, it's a ripple effect and it has impact on other things. The
facilities department with the board's approval, we need to take the position that the answer has to be no. At this
point, we have to draw a hard line because the reality is is there's no extra money to continue to pull from as you'll see and we move forward.
So, BHS, we're going to call it the theater project. We're going to strike
theater project. We're going to strike that and I'm going to pass it over to Mr. Wagner real quick. Thank you, Mr. Cle. Oh, here we are. Uh, so real quick
Cle. Oh, here we are. Uh, so real quick uh progress update on increment one. Uh,
we did break ground last summer and the contractors been doing great work. Uh
they are uh quickly progressing through uh basically the project finish out. Um
they've got all the exterior work done.
They're finalizing the little bit of site uh improvement on the exterior site work. Uh the in building interior is
work. Uh the in building interior is complete completed at the at this stage and uh they're going through the final testing of all the infrastructure of the building itself. Uh we will be ready for
building itself. Uh we will be ready for uh to use that facility. Um, so we'll have a full gender neutral uh facility for both uh students and faculty uh
right after spring break.
>> So as a reminder cuz a lot of folks in the audience I don't think they know what inc one was. Um and I apologize because we should have thrown that in there. So the larger project is the
there. So the larger project is the little theater as well as the entire house that 3500 seat the theater theater doing major structural upgrades and work and so on and so forth. included in that
we are adding a student lobby and it basically an entry lobby off of the little theater into the courtyard between the theater and the H building.
Understanding that when we started looking at the elevation just standing there and looking at the elevation difference between what we call level zero which is the gallery entrance uh
and where you stand to come out there in the H building you have a full building of height there. We also know that we have a tremendous problem on Berkeley High with not only not enough restrooms
for students and staff, but not enough genderneutral restrooms. So, what we've done is we put this project in this increment one, which added an entirely new building, which will actually be
located underneath the plaza of the gallery. And what that building is is
gallery. And what that building is is two restrooms, seven genderneutral restrooms for students and sever seven genderneutral restrooms for staff. And
as Mr. Wagner has said, that will actually be done the end of March. We're
going into spring break. We'll do a couple punch list items on it. We'll
also do the final cleaning. And on April 7th, when students return, barring any unforeseen, as I always like to say, that will be open for full use from students and staff.
>> And then on to uh uh increment two.
After increment one is finished up, we are currently finished with design for increment two. We are in DSA for DSA
increment two. We are in DSA for DSA approval. We got our initial round of
approval. We got our initial round of comments back from DSA already and we do anticipate having those uh comments or responded to with DSA uh by the end of
this month. Um we are anticipating
this month. Um we are anticipating getting our first draft of our GMP from our contractor uh by the first part of June which uh we'll be bringing to the
board by by mid June. Um, with that in mind, uh, if we are able to get to, uh, reasonable terms with the contractor on the GMP and the board's approval, then we'll go ahead and start, um, with our
DSA, we're anticipating DS full DSA approval by midsummer, which means we'll be able to start uh, the actual construction uh, by midsummer as well.
And if I may, and I mentioned this to subcommittee last night, and it's important to say now because what you just heard me say a moment ago was about Sylvia Mendes and just really about any project about those stakeholder
initiated adjustments that we have to draw a line and say no. And then on the screen, what you have in front of you is a project that's going to come back to you for the GMP approval. We are
currently estimating that GMP that contract to be about $110 million where the total project cost would be about $137 million. So you as the board or
$137 million. So you as the board or even the public can ask well why would you say no to such a small item at this particular project but you want to spend $37 million on a theater. It's a great
question and the answer is simple. If
you look at it from a seismic and a safety standpoint, there is no building at greater risk than that theater. That
theater, they began construction in the 30s. In the ' 40s, it sat vacant and
30s. In the ' 40s, it sat vacant and stagnant and completely open. It was
known as the steel bird cage for almost a decade because of the war and the shortage in steel. Then they came back and they finished it. But when they built it, while it was to the best structural abilities of their time,
there was a tremendous amount of structural issues with it. Even then
when we look at it from today's standards, we know that we have to do this. And when we consider different
this. And when we consider different projects, as we're going to talk about a little bit more further into the presentation, when you think of what the percentage cost of escalation is and the percentage cost of just inflation
overall, this is one project that the board cannot afford to defer besides for the safety piece of it. So, excuse me, but thank you. Okay,
>> so workforce housing, uh, I wanted to give you a quick update because this is something that's really near and dear to me. I've spent six of my last seven and
me. I've spent six of my last seven and a half years working on this with some incredible partners, including old board colleagues of yours like Julie Sinai.
Um, this is 110 units of affordable housing that is really designed to serve BUSD educators first. We are flying through construction, and I mean that in a really positive way. This is a
six-story building. The photos that you
six-story building. The photos that you see there are actually the seconds story courtyard looking in. Um, and right now where we are on progress is we anticipate and we have no reason to
believe that construction that it won't construction will be done in December or early January. So with that in April,
early January. So with that in April, next month we're going to be opening up uh working with Saha and Abode, our partners. We're going to be opening up
partners. We're going to be opening up the application portal. We've started to do a little bit of marketing to the district to all certificated and classified. Um January of 27 is when we
classified. Um January of 27 is when we anticipate the true opening and the ribbon cutting. We'll expect you all
ribbon cutting. We'll expect you all there. Uh and then with that from
there. Uh and then with that from January till about April of next year is when we anticipate postcomp completion leasing and move in. So this is 110
units mixed 1 2 and threebedroom units.
We prioritize BUSD educators. That's our
certificated and classified alike. And
these units are equally spread across 30 from 30% of the AMI, the area median income, all the way up to 120%. And the
goal with that was really to capture some of our lower paid classified singles or families up through our teachers as well.
This is the flyer that was sent out uh a couple of weeks ago to start some marketing as well as some different information and anticipated rent costs.
And this was sent out and we've asked our partners with BFT and BCCE to continue to nudge this to all of their members uh just so that it stays on their radar. We did work with Saha and
their radar. We did work with Saha and Abode that actually originally planned a really short window for that first round of applications to actually extend it from April until the end of August. The
reasoning for that and my push was in April our teachers are classified alike.
April and May they're bogging down.
They're getting ready for finals. come
June, everybody's feeling a little burnt out and it's easy to forget the things that are really important to you. Um,
and my hope was with them coming back in August realizing that maybe they just didn't click send, now they can do such and that first window remains open.
Uh, districtwide crisis alert, Kevin.
>> Yes.
So about a year year and a half ago, the board asked uh assistant superintendent CL to go find a system that would allow for quick uh notification of emergency
situations within the campuses and also allow for lockdown of the campuses as well. Um our the district safety manager
well. Um our the district safety manager uh Miss Evans went out and reviewed approximately eight different systems and the system that we're currently uh
that has been procured um is um uh by the kayak company uh in conjunction with uh CCUS ops. Um all the parts have actually been ordered and received by
the vendor. Uh they are actively
the vendor. Uh they are actively programming that uh software now and anticipate rolling out uh the first um
uh pilot site which will be uh the 2515 9th Street um by April of 20 April 26.
So next month um if that's successful then we'll start uh preparing for full roll out to all the different campuses over the summer of 26.
>> Yeah. and we're choosing to pilot that in my office since we're not studentf facing and we would rather know there if there is an issue with the system that can be worked out before we roll it out.
The one piece of this left that we still have to work on is we there will be a large PD that we will need to do really for all not necessarily a timely PD but or a time extensive PD but a large PD
for all of our staff. What this allows staff to do is it is behind broken glass or break glass but they can by with the push of two buttons they can lock down the entire campus. They also have the
ability to call for medical help or to call for administration assistance. So
with that, we started thinking, well, what does that look like, right? Cuz
this system is designed and it was really built in a way that it not only allows you to alert the campus to a problem, but it allows our first
responders to actually help track movement. And what I mean by that is,
movement. And what I mean by that is, Director K, right, if you lock down your classroom, right, well, we know that your classroom is red. And what we're going to do is in in the main office,
we're going to see on a map that your room is in the red. But what we want to know also is when do you go to the green? And if you go to the green, that
green? And if you go to the green, that your room is now all clear. Which way
did they go? Right? And that's a really useful tool for our first responders to be able to respond accordingly. So when
we started thinking about that and started talking about it, the number one problem that I had was that what we teach and what Homeland Security tells us to teach is run, hide, fight. So
chances are the folks in the administration offices where all these screens are housed, they're going to get out of the building. We're going to have first responders come in. Well, in the event of a school lockdown, if you have
a badge, you are required to spot respond. Doesn't matter if you're local
respond. Doesn't matter if you're local police, if you're sheriff, CHP, fishing game, you will respond. There's no way for us to train all these folks how to operate our system. What I don't want to
do is ask one of our classified employees or even one of our administrators to then go back into the building where we don't know what's going on to help those first responders
navigate it. So what we came up with was
navigate it. So what we came up with was a crisis liaison center. We have room in the back of 9inth Street uh my facility to actually build out what you see there
which is a crisis liaison center. This
allows PD or whoever is taking incident command of this to send a liaison to our offices and we can operate the system and communicate with the folks in the
field to let them know they're in this building moving east to west. They're
now on the second floor, they're now on the first floor, etc. Um, we're currently going through the initial proposal that's been completed. We're
still negotiating a little bit more back and forth with the vendor instead of cost for buildout and then reviewing some design options. Just always looking for value engineering opportunities, but what we don't want to do is value
engineer the benefit of the project away. But this was a way that we felt we
away. But this was a way that we felt we can really utilize this hopefully never have to utilize this system, but have have this system in place to be utilized while keeping all of our staff safe as
well.
So, we're going to talk about program funding highlights and I'm going to pass it to Miss Del Rio.
>> Uh, thank you, Assistant Superintendent Kis, and thank you, trustes, for having us here tonight. I love to talk about money. Uh, so let's talk about some
money. Uh, so let's talk about some positives and not just spending, but how we're also exploring additional funding opportunities outside of our bond, which is a really critical component in being
able to support uh BUC's initiatives for all the programs and all the projects that we have moving forward. So state
funding prop 2 is a critical element that we explore in ensuring that we have the opportunities to take advantage of what the state is giving us outside of just running our local bonds. So
currently we have four funding applications in hand that we are working with our partners of our state funding consultants. um two of them are special
consultants. um two of them are special additional funding opportunities that we're taking due to the conditions of these two projects and that is the little theater project uh which is now
the community theater as well um and the long fellow facility hardship program and those are two separate state funding applications that are in addition to our actual eligibility for each school site
that we have. So uh what that does is because of the conditions of these buildings uh the sense of emergency to address the seismic needs for both um we are doing the hardship applications and
what that does is actually puts us further ahead in the application process with the state um and identifies us as a higher need. So it allows us to get that
higher need. So it allows us to get that funding in hand much sooner than a regular state funding application would be. We have two other state funding
be. We have two other state funding applications that are in the pot right now as well. Those are regular eligibility per um per school site. Um
it's a strategic timing. Your
eligibility increases based on certain time frames over the last 25 years, based on how old your building is, the last time you did a modernization, um current enrollment. So, we don't just
current enrollment. So, we don't just throw applications at every single school site. It is a strategic process.
school site. It is a strategic process.
The other two applications that we have in right now are um eligibility that we have currently for the high school.
We're using the natiatorum um solar project that was just recently completed as well as a um PV solar PV project that we're also doing at Longfellow in the midst of all this construction. So
currently right now we're at an estimated about $57 million that we expect to be getting back from the state um particularly just for the two seismic projects which again is the theater and
the Longfellow project. um because we have the hardship uh due to the elevated need for to address these seismic um emergencies, not truly. Uh we are able
to again get ahead of that funding and we're really expecting to be able to get that money in hand somewhere between 2028 and 2029, which a typical timeline would probably push us closer to like
2031. Um, so it's really nice to be able
2031. Um, so it's really nice to be able to get ahead of the line and get um ahead with Prop 2 and hopefully get that money in hand um within a time frame that as we're executing these projects.
So the piece of that um as every implementation does, it changes. Um this
is kind of a snapshot from one of the original implementation plans from 2022.
Um and as we all know standing here in this building today, this has massly changed um since that initial initiation. And so if you go to the next
initiation. And so if you go to the next slide, we'll kind of talk about some of the li the projects that were added to this measure G list have different effects of reasons and wise. Again,
every implementation plan changes, needs come up, emergencies happen. So the
purple kind of represents things that were initiated through board action. Um
adjustments in priorities, COVID happened, that was a really big one. Um
additional access control implemented throughout the district. our heat
mitigation, which I know we're all sitting under these lovely fans today.
Pretty thankful for that. Um, and that's still only another increment coming this summer to addition to that. Longfellow
is one of those projects that actually falls into the purple and the blue. It
was pushed forward in executing that project thankfully. So, cuz as we all
project thankfully. So, cuz as we all know from 2024, we started it, you know, get into the building a little deeper and found the um structural elements that needed to be addressed. So it also kind of fell into the blue which is
where you know it represents a lot of projects that were urgent due to operational needs unforeseen circumstances and you know we needed to get creative with alternative funding.
So, um there's windows that were added or replaced over at the adult school elevators over at John Mir again. Um
Emerson storefront cars happen. Um and
again, this is one of those things to remember that every implementation plan will always face its changes as the years progress and as needs um are rep
prioritized and readressed. So, um this is just kind of again that snapshot from your 2022 to now. There has been a lot of drastic changes and we'll go a little bit more into the um proposed uh additional changes that we're going to
make to measure G, our um current green and yellow sheet. But this again is just kind of the background to understand where we're at today. And if I may, Ashley and I talked about this and we wanted to show this because this will
probably be one of the less popular things that I say tonight, but to the same way that we have to say no to stakeholder initiative adjustments moving forward because of where the bond is. At this point in time, when the
is. At this point in time, when the board says, "Hey, can we fit this in?"
My answer has to be no unless we take away from another project. It is not uncommon to over encumber a bond. It's
quite normal. and we over encumber a bond based upon developer fees, based upon state funding, etc. We have now over encumbered the bond to include
everything anticipated through state funding, through developer fees, all of those numbers put together. So the
purple, what we were talking about on the left, which was sort of the board initiated projects, that represents about $120 million, right? And then the ultimate the the needs, those one-offs
were another $30 million. So at this point we really fitting anything else in means that the board will have to struggle with taking away. Now I say that but I should say fitting anything
else in after the vote that we're going to ask you to have tonight. Let me be really clear about that.
So facilities subcommittee update. This
is I think what the folks behind me are here to see tonight. Uh Washington
versus AI AI. And a few people asked me why we named this. Uh AI AI is athletics infrastructure additions and improvements. Or for those of us from
improvements. Or for those of us from New York, it's AI, right? Like that's
what it is. I just wanted to do that. So
AI AI that's all right. I'm okay. I'm
going to run with it. So it has a relatively short window for design and approval. The impact for this is greater
approval. The impact for this is greater than one school. The impact for this is BHS. It's BATA. It's the BIS, right?
BHS. It's BATA. It's the BIS, right?
It's also a huge community impact. It
impacts our student athletes and the community as a whole. It corrects
operational deficiencies at Tim Mullering Field. I heard uh Ross earlier
Mullering Field. I heard uh Ross earlier talking about what they have to do when that field when it rains when we get a tiny amount of rain. And I know that I can't correct what was done many many
years ago. What I can tell you is to
years ago. What I can tell you is to echo what I heard tonight. We are in the 25th year of our tennis team, tennis teams, excuse me, without courts. So, by
the time these courts have built, they will have gone 26 or 27 seasons without having any home courts. This addresses
also a long-standing community commitment. Our boards and boards past
commitment. Our boards and boards past for the last two bonds have actually made commitments to do these courts and I think what the community is asking for is that we move forward with that. Now,
how do we do that? what's on the table right now because as I've said anything that we give we have to take away. The
Washington modernization has taken a lot longer to get through DSA and design than originally anticipated. It actually
got DSA approval 2 days ago. But with
that, what was the Washington modernization or what is it? It's
improved entry. It's a new kitchen and servery. It's redmising of existing
servery. It's redmising of existing interior space as well as some ex some upgrades to the exterior.
What was decided last night at the subcommittee, and I know it wasn't an easy vote, but what they struggled with was that AI AI, we're all going to say that, did win, was that the athletic
improvements additions and infrastructure absolutely outweighed the need to do the Washington modernization.
So, what we're going to ask the board to do tonight is actually vote on this once we're done.
So, what that project includes is turf installation. There's been a big push
installation. There's been a big push from the athletics community to go to not only improving drainage but to adding artificial turf drainage improvements. Five new tennis courts.
improvements. Five new tennis courts.
One of the coaches asked me earlier and I couldn't remember. I double checked the plans. Those are five doubles. All
the plans. Those are five doubles. All
of those courts are doubles that are out there. Basketball court will remain but
there. Basketball court will remain but it will be relocated. We've gone through that with BTA so that they understand the sighteline is still there. Student
restroom and changing facilities. This
is an operational deficiency that it's been lacking since it's been built. And
then fencing improvements. We understand
that even though that those fences are high and the nets go even higher, we've got some amazing student athletes and they're hitting it over the fence. So,
we need to improve that.
Uh, additionally, in the design, and this has to go through SEA, this has to go through the California Environmental Quality Act and a full environmental impact review. included in this project
impact review. included in this project is lighting for baseball and separately lighting for tennis and for basketball.
Now, that does not mean that that will be done. What that means is that there
be done. What that means is that there will be a full community engagement process through SQA to determine what the impact of that is and then if that gets installed or what restrictions are
put on it. That project is estimated at 15.4 4 million and it does include the turf replacement of the football field which has reached its life expectancy.
And then we're carrying a bid alternate and what that means is depending upon where the bid comes in will determine whether or not we can truly afford it.
We're carrying a bid alternate to do artificial turf on the on the softball field on the campus as well. That was
another request from athletics due to the drainage issues and the amount of time that it can't be used. But that
piece we cannot commit to until we get our numbers in.
So this here is just a quick schematic diagram of what that would look like.
We've gone through this before. Um this
protected the most amount of green space on that on that mullering field. Uh it
had the turf field installation. We
added a student restroom with changing rooms, five tennis courts, and then the relocation of the basketball courts.
And Measure G program update. I'm going
to let Ashley take again.
>> Uh so based on last night's uh subcommittee meeting, we had two options to show how this was going to look.
Well, really actually one option or none. Um the biggest thing is with the
none. Um the biggest thing is with the AI AI, that means that we'll be removing that scope from the BHS CE uh project and making it its own uh to be able to
still move on design for the CE project, which is the twotory addition to the high school as well as CTE upgrades to the existing building. And then the AI AI is what we just talked about, what Mr. Glee uh was able to go through in
scope. We're pulling about 1.8 million
scope. We're pulling about 1.8 million from CE to push the design and SQL needs that we have for AI AI. Um we would be reducing the Washington modernization
project by about 2 uh 12.4 million. Uh
that money would get reallocated up to the AIA project. uh that 1.1 that you see remaining for Washington is to cover all the pre-esign and pre-construction costs that we've paid to date. Um and
then the Sylvia Mendes project as um we reviewed earlier with Superintendent Kises for another about 4.5 million that we need to increase on that total budget to get through finishing um up through the end of the summer. So all in all
with the tradeoffs we're adding about another 5.7 million uh to the total measure G project uh budgets. But again,
as well to remind you guys, yes, we are over encumbered, but we are always getting creative and always exploring additional funding opportunities, even outside of state funding. We're looking
at grants to multifund some of these projects and other means uh that are out there to really support this whole bond program as a whole.
>> Yeah. And two things real quick that I didn't think to include in here, but one uh I saw I saw a reaction to the 1.1 million on Washington and what it made me think about was sort of do people
wonder does that does that money just go away? Was it wasted? No. So we got DSA
away? Was it wasted? No. So we got DSA approval either yesterday or today. So
what that means is now we have 5 years to open the box with DSA to start that project, right? Before we have to just
project, right? Before we have to just go back and update the original plans.
The other thing to Miss Del Rio's point about grants and whatnot, currently we're working on a grant with the NFL for about a quarter of a million dollars to help offset the cost of returfing the stadium field. We'll also be working
stadium field. We'll also be working with the USA to look at a grant to help with the costs for the tennis courts.
So, we're always looking at different funding opportunities that go beyond just state funding, developer fees, or bonds.
>> Okay. And as projects are being completed and we're closing out and we're getting unused contingencies and unused allowances back, that's where you're going to see the reduction in these budgets going back into our pot of
money to to, you know, relieve some of that incumbrance as well. So that's also things to consider.
>> So with that, we will open it up for any questions.
>> Thank you so much. That was a a very thorough um review and and we really appreciate you taking the time to do so.
Do we have questions, board members?
Yeah, student board member, >> excuse me. I had a question about the district-wide crisis alert system. Um, I
was wondering how that's going to work with non-emergency usage, especially at Berkeley High and we have a lot of like fire alarms and interruptions and like the class time. So, I was wondering how that works, especially with um the crisis leaison center if that's
something that's being employed with that.
>> Yeah, it's a great question. So when we actually went and looked at this system after the the system was chosen by our safety coordinator uh and recommended to us, we actually went and looked at the
system where it hasn't been installed in a school in Southern California. Uh and
we took principal at AOSA with us to think about that because of all the schools we said Berkeley High that's the one to control and honestly the easiest way to control it is to install all of
those push panels behind break glass, right? The small glass panels that you
right? The small glass panels that you do have to break. Now, is that going to stop everybody from breaking it and setting it off? Unfortunately, not. It's
going to be about behavioral change, right? But this is something that we all
right? But this is something that we all and the board as well felt that it was important enough to consider so that we can always put the the the safety of our students and staff first.
>> Can I follow up on that? Does that mean that that um is it just safety lockdown alert?
>> Yes.
>> Behind the brake glass or is it fire?
>> So fire alarm is completely separate and it will remain separate. There's three
features of this uh one of which you have to break the glass and press two buttons simultaneously to lock down the campus. That's going to come over the
campus. That's going to come over the PA. It's going to come over the strobes,
PA. It's going to come over the strobes, the horns. it's going to be everywhere
the horns. it's going to be everywhere that that campus is in a lockdown. The
other two options is that you can call for medical support. Those will go over a radio or you can call for administrator assistance. Those will go
administrator assistance. Those will go over the radio as well.
>> I So I heard you say that we would need to do professional development to train the adults how to use this system.
Are we going to train students? Are we
going to how how how are students to know or not know about the workings of this system? The short answer is I don't
this system? The short answer is I don't have the answer yet. We are working on it. It's something that we're thinking
it. It's something that we're thinking about. We need to start thinking about
about. We need to start thinking about it. Right now where we've been focused,
it. Right now where we've been focused, our lens has really been about what is the project and how do we implement the project. Now that we're to that point,
project. Now that we're to that point, we need to start thinking about it and talking with our partners in ed services to think about what is that going to look like not only for staff but student facing as well.
And the school that you visited in Southern California had this district centralized crisis response.
>> It actually had it on that campus. Yeah.
Uh it was on that particular campus for it. But yes, it did.
it. But yes, it did.
>> And it's not staffed unless there's a crisis. Right.
crisis. Right.
>> Correct. But with putting it at 9inth Street, 9inth Street is not only where I am, it's where several of my key leadership is, but also our safety coordinator and also our after hours
folks, our after hours custodian, supervisor, etc. Right. So, that
building typically has somebody in it from at least 6:30, 7 in the morning till about 10:00 at night.
>> Mhm.
>> Okay.
>> Um, I'm going to follow up with that.
Thank you so much. Um, and thanks for, you know, we've had I think the board and facilities members had some conversations about this a couple years ago, I think. Um, so this is exciting as well. Uh but um you know some of the
well. Uh but um you know some of the kind of mechanical questions behind this I kind of had big regulations of um information you previously provided
these panels are they hardwired and or are they connected by you said radio or or what's the system?
>> No there there's there's a combination of hard wiring of radio signal as well as cellular data being used.
>> Okay. Because it's going to go across the entire school district.
>> Yeah. So part of the initial scope review with the contractor when we were working up the price was they had to come out and not only survey the sites actually for the location to understand what it was going to take, they actually
had to take cellular and radio readings at all different places amongst the campus to understand what boosters were needed, what amplifiers were needed, etc. >> So there's a certain amount of redundancy it sounds like um with the
three different forms of communications.
Okay, that's that's great.
>> Um are there other questions about this?
Yeah, Dr. Schnowski, >> I have a few comments. Um, so first, I'm really excited about the um bathrooms at Berkeley High. Um, this is another sort
Berkeley High. Um, this is another sort of additional project that you all put in um and expedited uh because of calls
especially from our students and our staff. And so knowing it was supposed to
staff. And so knowing it was supposed to be April and knowing that when kids get back from spring break and and staff get back from spring break, they should have access to these bathrooms is really
great. So thank you so much for that.
great. So thank you so much for that.
It's very exciting. Um and also the progress on Sylvia Mendes that will start, you know, next year with hopefully plenty of lead time to move in
and get settled and really like live in that space. That's super exciting. and
that space. That's super exciting. and
Longfellow. I live by Longfellow, so I can see through it right now, and I'm excited to not be able to see through it anymore. Um, yeah. So, I also want to um
anymore. Um, yeah. So, I also want to um really thank everyone here for their advocacy for the courts and for um
upgrading our our baseball field. I
really want to thank I don't think Coach Tiffany's here. Oh, yes, she is.
Tiffany's here. Oh, yes, she is.
So, you don't know that I know you probably, but I've heard a lot about you and I remember when you came last year.
Um, congratulations on your wedding.
And, um, the girls talk so highly of you and, um, you and Jeff especially, I want to shout out to thank you for keeping your teams going under really, really
challenging circumstances. So, thanks
challenging circumstances. So, thanks for sticking with everybody.
This really is a comment on the facilities presentation, but I also want to thank Robin and Ross um for yes for um juggling a really challenging
situ well many challenging situations and I had no idea when I became a board member that we had so many different sports teams. So juggling all those facilities, all those athletes, all
those sports, all those parents, um all those neighbors is really a challenge and you guys do it so well. So thank you so much.
And finally, I want to take our thank our facilities team because um this mowering field project, I always told John like this was a priority for me um that I thought it was really important
for us to keep our promises. And I
remember, you know, as Longfellow was happening and all these things were unfolding, John just shaking his head, kind of thinking, being skeptical that he could get it done. Um, and so the
fact that we that you all you and your team were really able to do this is really a testament to your commitment to the community and your commitment to um
the needs of all of our students. So,
thank you.
Can I ask like >> Okay, I'm gonna let Jen interrupt me >> just before she makes the motion
um everything she said and I have um I have just two quick questions. So,
thinking about um the athletic infrastructure additions and improvements project because I disapprove of this acronym. might think
it's silly.
>> It's going to stay.
>> Um, thinking about weighing it against Washington. My question is, have you
Washington. My question is, have you engaged with the Washington community?
Are they aware that their project is going to have to be delayed? Um, and
then similarly, can you talk a little bit about the engagement that I know you've done with the neighbors around Mullering Field?
>> Sure. So, uh, the first the first question as far as Washington, we haven't only because the subcommittee recommendation to move this forward to board was made last night. So, we
absolutely will. Unfortunately, our
architect who is working on that and even our contractor who's doing the pre-construction, unless they're watching the board member, they the board meeting tonight, they don't even know, right? So, we'll have to reach out
know, right? So, we'll have to reach out to them. This was something that moved
to them. This was something that moved very quickly, so we haven't had a chance to engage yet. uh around mowering field.
We did have several more community listening sessions. Uh we did one
listening sessions. Uh we did one online, we did one in person. We got
some really good feedback at them. And
we did commit at that point in time to say, "Hey, we're going to come back to the community, but we don't know what that looks like yet." That hasn't changed. What that will look like now,
changed. What that will look like now, assuming that the board does want to move this forward this evening, is that community engagement and that open listening process will really happen
through SQA through the environmental impact review. Uh because what we would
impact review. Uh because what we would hear is if the board wants to move this forward is that the governing board is making the decision that this is a priority and now we just have to make it
work within the community.
>> Thank you for that clarification. Now
I'm done.
>> Let me follow up really quickly too. Uh,
apologies for the interruption. Um, so,
uh, what we're voting on is AI AI.
>> Yes. So, make sure I understand what we're moving for. Um, Washington, um, those that modernization could potentially be in the future. Is that my understanding?
>> That moderniz you would be voting to defer that modernization to, as I mentioned at the last facilities update.
Uh, >> God, I don't remember when it was. It
was a few months back. We we are really firm in the belief that while typically Berkeley does a general obligation bond for facilities every 10 years because of
unforeseen like Longfellow because of cost escalation because of COVID, right?
And I hate using that as an excuse.
We're going to have to consider going for another bond in 28. And if we do that, this would be one of those projects that's now been moved to the deferred list. And with that deferred
deferred list. And with that deferred list, obviously we would try to prioritize those. There's several key
prioritize those. There's several key factors, right? When does the five-year
factors, right? When does the five-year mark hit? So, when does it expire? What
mark hit? So, when does it expire? What
does cash flow look like? There's so
many variables and to how we issue the money because again, when we issue the money, the goal is always to keep the tax base as low as possible. Even when
we did the last issuance last year when I sat here and we talked to the board about it, we explained that because of the times that we were in and the market was so volatile that our your
constituents were actually going to see a jump in their tax bill, a heavy jump for about one year and then at year two they would drop again and then at year three it was an exponential drop. And we
structured it that way just to be sure that the long-term effect was the was the least. So, okay. Thank you for that
the least. So, okay. Thank you for that overview. That's helpful. Do we have a
overview. That's helpful. Do we have a motion?
>> I forgot to thank one other group and that is the student athletes. I'm so
sorry. It was in a different line.
Especially some of you that I've seen for years and also those of you that are advocating not even for yourselves because you'll be gone, but for the
future generations of tennis players.
So, thank you.
And we hope if all goes well, you'll be at the ribbon cutting in fall 2027.
>> And let me speak to that actually because I did mean to earlier and I have nine minutes left. But no, uh I I meant to talk about this earlier. Uh we were talking about at the team today about how do I wanted to do this. So what the
board has asked us to do or the subcommittee asked us to do originally was figure out a way to split this project. figure out a way to split
project. figure out a way to split mering from CNE. We've done that, right?
But now what we're also doing is we're looking for ways to actually split this AI AI project. Meaning, we're looking to see with the turf field for the
football, for example, since that's a replacement in kind, do we even have to put it through DSA? If I don't have to put it through DSA, we'll be rolling new turf there this summer. If not, it'll be
the following summer. But then even with the tennis courts, that's something that assuming that we can get through DSA in time. We know that we will not be able
time. We know that we will not be able to start the football or excuse me, the baseball field mowering field till summer of 27 just because of when baseball happens. But that's not to say
baseball happens. But that's not to say that come January of 27, if we have all the necessary DSA approvals, we can't be putting in the infrastructure and ultimately laying those tennis courts,
that tennis could potentially be open as early as April or May, right? So,
there's a lot of unknowns, there's a lot of variables. What we anticipate is
of variables. What we anticipate is August of 27 for everything to be 100%.
But we are looking for ways to try to roll it out incrementally to get it done faster.
Great. So, I'd like to make a motion to accept the subcommittee recommendation to reorder our projects such that the AI
AI project um is done under this bond.
Do >> we have a second?
>> Do we have a second?
>> Yes, I will second. I thought you just said you were seconding.
>> I'll second.
>> Which project will you second? I I just love hearing the act. I would like to second the athletic infrastructure additions and improvements.
>> It'll have to be spelled out. Um, thank
you. And do we have the eyes?
>> I I >> So, I mean, the motion has passed. Um,
thank you.
Woo!
>> All right. Congratulations. Um,
good to see everybody again. Uh, we're
going to move on to our next agenda item, which is 13.2, the second interim report for the period
ending January 31st, 2026.
25.
I heard the voice.
Um, so she went to the bathroom. So,
>> you want to get ready? Yeah. Okay. Um,
we're going to start up with uh 13.2.
Everybody ready?
>> Miss Charz, you're going to have to push the alarm.
When did you know?
>> Okay, we're ready. 13.2
uh approval of second interim report for the period ending January 31st, 2026.
>> Deja vu.
>> Um so good good evening.
>> I literally had board members presentations >> because what do you got?
>> They're so noisy. Um so we'll be presenting the second interim report um for the period ending January 31st. But
before I do that, I'd like to present our executive fiscal director Medie Rivzy who has been with us since October.
>> So and you met some already. So
>> okay, so with that being said, um we're going to um go on to the next slide. So
um again our presentation is grounded in our mission and in our four E um excellence, equity, engagement and enrichment. And this evening we're going
enrichment. And this evening we're going to present the unrestricted our focus is unrestricted general fund. We're going
to look at budget highlights. Um the
fund one through four summary, the variance report, our ADA enrollment, multi-year projections, fund 20, federal
funding, other funds, Prop 98 minimum funding and settle up and next steps.
And tonight we're asking the board to approve our second interim um report.
So our budget highlights um the first thing is that we actually we are we have a positive certification that means that we can meet our fiscal obligations for
the current year and two subsequent years. So we're presenting our budget as
years. So we're presenting our budget as um as positive.
Um the other thing that we need to mention is that um since we closed the the second interim in January, we had settled with three of our um bargaining
groups. The impact of that is not
groups. The impact of that is not included in the second interim because it's a subsequent event. Um it will be handled with in the AB1200 um that we present to the board in terms
of settlements.
Um and another thing that we have to um to mention is that we use the one-time savings. Second interim is a point at
savings. Second interim is a point at which we look at the budget and any unspent BA balances we take it to the bottom line which is actually helping
our ending fund balance at the second interim and in turn it's also helping the beginning balance for 2627 which is a budget year that we're working on
right now. Um the other thing um our
right now. Um the other thing um our contribution to special ed at SEC at first interim we had contributed 3.2
million. Um tonight you'll see that this
million. Um tonight you'll see that this amount has been reduced by 1.1 million.
Um but we're evaluating this amount to determine if it's one time or ongoing.
We've treated it as a one-time adjustment which means the following year it's gone back up by 1.1 million.
But um but this is being evaluated um with the project team.
And as a reminder also um the board on at the February 5th meeting approved an increase to sped transportation by 600,000.
Um let's see. Um the undesated fund balance um is $2.3 million which is a far cry from the negative $6,000 we had
at first in this is mainly due to one-time savings and um as before we have not set aside funds for the LCAP
supplemental um 800,000. Awesome.
um 800,000. Awesome.
So the fund one through four summary, it's important because on the next slide you can see we have several columns. Um
and the columns um include the fund one unrestricted, the fund one restricted, fund two unrestricted and restricted, BEP and bearer. And the far three
columns are the total unrestricted, the total restricted and the total fund. And
why is this important? It's important
because what uh most people look at are the last three columns and they think that's the district's general fund. It's
not include it includes BAP. So um so for instance our revenues for the unrestricted general fund which is our focus is 124 million. When they're
looking at the total fund they're looking at 237 million and unrestricted total they're looking at 194. So we have
to set the stage because our focus when we're determining whether we're positive, negative or whether we can afford um things that we have promised
is the unrestricted general fund which is the first column.
So with that um I'm going to turn it over to Medie to do the variance report where we're looking at the change from the first interrum to the second
interim. Yes. So in these variance
interim. Yes. So in these variance reports these are important because um at the beginning of the year we have the adopted budget and then we have the
first entrance and now we are into second ent. So the numbers change during
second ent. So the numbers change during the year and what we have to um present here what was the situation at first in what is the second in
what has changed and what are the reasons for those changes. So the there are four main areas that we have identified as ABC D and on this first
page you could see that we are showing you first a saving of um the 1.2 2 million and there are some details that
you could see. But then that saving has been offset by $600,000.
The the $600,000 uh for the special ed transportation that was approved by the board earlier.
So then our uh what we will be saving here is $.6
million.
Then we go on and we are looking at um uh inter fund transfers.
Previously in the first entry that the approval was for $700,000.
Now we are saying that $1 million from fund 20 into the fund one. So that is $300,000 additional.
On the next page, the point C that we see here, what Pauline earlier highlighted,
we have identified those savings that we believe we will be able to um recoup in the special ad areas and which is
slightly above $1 million.
And most likely they will be one time we will be evaluating but at the moment they are taken as a saving only in current year and not in the next two
years.
And the last item uh that we have is there is a slight adjustment for the labor um agreements. Previously it was almost
um agreements. Previously it was almost $2 million.
Now we are talking about $1.6 million.
So it is a saving of around $.3 million.
And again what Paulina earlier stated I will reiterate that this is based on numbers as of January 31st. So whatever
we have agreed the bargaining agreements and with those three unions those numbers are not part of the presentation here.
>> Okay. Thanks Mie. So um Mie shared um what's causing the change from first interim to second interim and as I mentioned earlier a lot of that is due
to one time um savings or onetime unspent balances.
Um next we're going to look at the ADA and enrollment. And this chart um I have
and enrollment. And this chart um I have shared this before. Nothing has changed um because we're still um sticking with
the assumptions um the still the same enrollment and attendance um assumptions.
And um on this slide, as I have demonstrated before, um the funded ADA is now the same as the um as the P2 ADA.
And that's because we're no longer benefiting from um mitigating factors that the state put in place due to the um pandemic. So for instance you can see
um pandemic. So for instance you can see in 2021 the third row down um we actually received 9426
um from the state whereas our actual P280 was 9,09 that's in the first column. So in the third row and the
column. So in the third row and the fifth row you can see that we're funded at a higher amount. Now we're in 2526 and the outy years um that third row
we're at 8923 which is the same as the fifth row which is the P2 ADA. So we're
now getting exactly what our attendance is and that's what drives our LCFF calculator.
Um, next we're going to look at the multi-year projections. And as I
multi-year projections. And as I mentioned earlier, this does not include um negotiated increases and it's based
on the governor's 2627 proposed budget.
Um, whoops. How do I go back? Oh.
Ah, got it. So, um, what's included here is the assumptions from the governor's budget for 2627.
So the coler that was higher um when we presented the first interim it's now at 2.41 and the revenues have decreased by
600,000 in 2627.
No other changes on this page. So we
have actually taken something from the governor's budget and that's just the assumption for revenue um in cola.
On the next page, you can see um our expenditures for 2526 um is significantly less than 2627 and that's because we took one-time
savings that brought our expense expenditures down to 108.8 8, but those expenses are actually added back in 2627
um because like I said there were one time savings and then the increase in expenses in 2627 would be the cola uh
the the step column in in expenses um sources and uses of the next section and what's important to note in this section is that the transfer from fund
20 that Medi explained um had increased by 300,000.
That's a million dollar, but it's one time. It's only being recognized in
time. It's only being recognized in 2627.
And then the transfer to special ed, which is further down in that section, um is 33.5 million, but you can see it goes up to 34.5 million in the out
years. And what does this do to our um
years. And what does this do to our um our change in fund balance? um because
of one-time savings. You can see we have a surplus a one-time surplus of 2.9 million in 2526 where deficit spending in 2627
and we have an undesated fund balance 2.1 million in 2526 reduced to 300 in 2627 and pretty much
zero in 2728. But this is before we introduce budget balancing solutions and before we know what the governor is going to do with one-time funding for
2627.
So the other thing um that we looked at um medic mentioned that we transferred funds from fund 20 and this is a a view
of um an estimate of um our ending fund balances over the years. um in fund 20.
And again, this is set aside for um paying for actual cost of retirement. Um
and you can see the costs kind of fluctuate yeartoyear and we're looking into that. Um but we're estimating that
into that. Um but we're estimating that we're going to be spending $900,000 in 2526 and we'll have uh a ending fund
balance of about 1.3 million. Um the
transfers out is the million that we mentioned before. So at first interim
mentioned before. So at first interim that slide would have had 700,000.
So um so we've been using this um to kind of shore up the unrestricted general fund on a one-time basis. We had a
significant um transfer out in 2425 of $6 million.
Um, so our fund balance went from 7 million to 2 million. So, um, this is not a source that can be used for ongoing funds. Um, we're down to a
ongoing funds. Um, we're down to a million dollars at this point.
>> Um, did you want to talk about federal funding?
>> Yes. So federal funding you could see that we received those federal funding
in four funds 1, 11, 12 and 13th and fund 51 is also highlighted but we don't control that fund 51 that is the bond
interest and redemption money. So we
really don't control and the county treasurer they control this. We have um we um look into the other four first
four funds and as you could see that we have not made any changes into those funds between the first entry and the second entry. This is due to the
second entry. This is due to the uncertainty that we have at the moment and al
we have tried to keep those numbers on the lower side and hopefully even this money we we are hoping that we will be able to receive even this this much
money uh from the federal government.
>> Thanks Marty.
So, um, as a reminder, um, our while our focus is on the unrestricted general fund, the district does have several other funds, um, an ending fund balance
of $140 million. We've listed the funds.
Um, we've listed the beginning fund balances and the ending fund balances.
Fund 20 here is at 1.2 million. So, um, there's a little bit of
million. So, um, there's a little bit of a discrepancy between the estimate that we had, but the this is an interesting slide because it gives us the full
picture of the district's budget, not just the unrestricted general fund, which is our focus.
And then, um, there's been a lot of discussion about our Prop 98 minimum guarantee and settle up. So I presented
some slides in terms of what is a Prop 98 minimum guarantee and what it isn't.
So it is a constitutional amendment that guarantees funding that legally binds um a minimum minimum annual funding level
for schools. Um they do go through a
for schools. Um they do go through a three test um process and we're funded at the um at the highest calculation.
Um however this can be suspended when revenues are low and um the suspension actually creates a maintenance factor or
a debt that must be paid back. So it's
not a re predictable revenue stream.
It's not a shield against budget renew maneuvers. It's not for specific
maneuvers. It's not for specific programs. It's not an unbreakable promise. It's not a funding ceiling. and
promise. It's not a funding ceiling. and
it's not always full funding and that's when we we get into the settle up arrangement.
So then um with the settle up um this is basically the recognition that the state failed to pay us the full amount that we were guaranteed
and um so it's not a permanent funding increase and it does not guarantee immediate payments um and it's not voluntary. The minimum
guarantee is revised upwards. the state
must pay the difference to meet the constitutional requirement.
So, um it is a debt that the state owes us, but they kind of decide when they're going to pay it. There's no guaranteed time as to when it's going to um be
paid. So, on the next slide, um what can
paid. So, on the next slide, um what can we do? Oh, well, I'll just skip this
we do? Oh, well, I'll just skip this section. Actually, no, this is important
section. Actually, no, this is important because this kind of gives you a history of the setup. Um, we have a $5.6 billion setup that the state owes us,
which is about $8 million for Berkeley.
Um, this is a huge amount um for any district, especially our district. In
2425, there was a $1.9 billion settle. So, um,
they're basically kicking the can down the road and, um, it does not necessarily equal to total need. is just
addressing the the difference between the estimated and the actual revenue figures and it's not necessarily what we need for programs and it's not part of
the main budget calculation. It's like
an oh by the way we owe you guys this amount. So um on the next slide um we
amount. So um on the next slide um we have to take action to secure the um the owed prop 98 funds. So there's
coalitionbased lobbying um or CSBA or CTA and school superintendence advocacy.
Um and on the next slide um direct lobbying and testifying and then also um the fact that there's a oh I'm not on
the next the fact that there's a settle process. We have to make sure that the
process. We have to make sure that the state does pay us what um what they owe us. Um and that's important for us to
us. Um and that's important for us to maintain our programs. So So what's next? Um we have to look
forward to the governor's may revision.
He may um change any of the assumptions that he gave us um with his January budget. Hopefully he will tell us more
budget. Hopefully he will tell us more about the one-time spudbug funding. Um
so we're hoping to hear more about that.
Um we're in the middle of conducting meetings with the superintendent's budget advisory committee and other partners and that's going to allow us to
um finalize the target and have strategies to meet the target. So we had a meeting with ESPback just before we came here and I think our next one is on
the ETH. Um we have to um finalize the
the ETH. Um we have to um finalize the impact of the cost of negotiations on the target. Um, we have to evaluate
the target. Um, we have to evaluate program costs as we try to find efficiencies in trying to meet the target. And of course, our drive is to
target. And of course, our drive is to continue lobbying for Prop 98 setup funds because then, you know, our target
would possibly not even be in existence at that point.
So, um, we are going to be closely monitoring federal funding as well. of
the funding that many presented um to assess funding for programs because it is going to impact future funding. So
>> and in fact if I could add one thing what we are just seeing in the stock market which is going down and the
revenues that California state of California receives capital gains is one of the bigger pie of that. So if the
stock market is going down so what we believe that in May the numbers for the prop 98 guarantee would be lower.
>> Mhm. So at the moment I don't have any hard data against it but this is what has happened and because uh the revenues for the state comes from the capital
gains the personal income tax and the sales tax those are three main revenue sources and capital gains we see that would be lower.
>> Okay thanks.
So um again we are faced with near um near and long-term challenges and we need to continue to develop comprehensive plans to maintain fiscal
solveny and preserve the integrity of our educational programs. So um there's a section on staying informed and engaged. Um but that's just
has like um the information that we have on our budgets. So, we'll take any questions at this time.
>> Thank you so much. That was um really helpful and I appreciate the time you put in put into this. And I I got that pre-exposure on the audit committee and I really appreciate the hard work you've
put in to ensure that our district's our district maintains solveny and continues to be in the black. Um I know that that the line is pretty uh close
pretty uh close >> in terms of um our reserves and you know >> in terms of um our reserves and you know hitting the reserves and also the 3% hitting the reserves and also the 3% statutory requirement statutory requirement >> right >> right >> and the um the remaining budget to work
>> and the um the remaining budget to work with. Um do board members have
with. Um do board members have with. Um do board members have
with. Um do board members have questions?
questions?
>> I don't have any questions but I have a >> I don't have any questions but I have a comment. Um I know that that the line is
comment. Um I know that that the line is comment. I just want to put in my, you
comment. I just want to put in my, you know, weekly plug for the fact that California is the fourth largest economy in the world and that there is no reason that we have the kind of budget crisis
that we have that means we have to lay off um folks that work in some of our, you know, really beloved programs and
that if we were actually to get the Prop 98 guarantee, um, we would be getting another at least $8 million. It's about
$1,000 per ADA and that would almost entirely eliminate the need for any March 15th or May 15th uh letters. So,
um I just encourage anyone who's in the audience or listening online or to the recording later um to make sure you get involved in that advocacy because it really is
important. There's absolutely no reason
important. There's absolutely no reason we can't fully fund education in California and healthcare. Thank you.
>> Thank you.
>> I'll just ditto what both of my colleagues said. First, really grateful
colleagues said. First, really grateful for all the hard work. Grateful for the positive budget certification. It's nice
to see the numbers moving in a positive direction even if it's still, you know, there's still budget challenges ahead of us unless we win the fight over Prop 98.
>> Um, >> when we win the fight over Prop 98, everything will be rosy.
>> Um, yeah, and I participated today in a lobbying session with CSBA >> um that was organized. So I I was with other schoolboard members from um other
from other local districts meeting with one of our legislators today and Prop 98 was the top issue that we were talking about. So um there to your point Pauline
about. So um there to your point Pauline there are multiple organizations who are working on this and um we all need to keep the pressure on.
>> Yeah.
>> Absolutely. Thank you so much. And and
does our student board member have a question? Add one quick question. So you
question? Add one quick question. So you
know um you did note that um in this I believe this iteration of the board for this that we we had basically borrowed from fund 20 >> to ensure our solveny and we do see the
fun 20 numbers dropping significantly from seven down to 1 something. Um
>> so we need a vote to approve the second interim >> I move to approve the second interim report.
Okay.
>> Second the approval of the second interim report.
>> Uh do we have the eyes?
>> I >> I >> I think it's unanimous. Okay.
>> This has a form.
>> Liz is going to give you the um >> Okay. We got got to get the the form
>> Okay. We got got to get the the form out. Thank you.
out. Thank you.
>> Thank you.
Um so we don't have any um comments online and we don't have any do board member comments.
No.
>> Okay. So we've adjourned the meeting.
Thank you so much.
I had a lot of slides.
>> I know.
No, just sign above the uh above your name.
>> That's it.
>> Yeah, he's signing it. Let me grab it.
Loading video analysis...